My Master bathroom remodel is officially complete as of today. The guys finished it yesterday and Lumberg and I just put the finishing touches on it this evening (totally awesome detachable shower head, new toilet seat and flusher handle). It's only been about a year and a half since i put my foot through the tile wall of the old shower stall. ah well.
there is so much yet to be done around this nightmare of a house. so far i have a new kitchen and a new master bath and a half way repainted/decorated powder room I'm doing myself.
Next I really want to rip up the carpet on the entire 2nd floor and install some flooring. I would love to do that. I imagine it to be quite a pain in the ass having to move everything we own in order to get that done though. Plus the cost will be rather high I assume and I dont like parting with my cashola even though I have enough to do it.
gosh and my dining room and bedroom need curtains
there is so much yet to be done around this nightmare of a house. so far i have a new kitchen and a new master bath and a half way repainted/decorated powder room I'm doing myself.
Next I really want to rip up the carpet on the entire 2nd floor and install some flooring. I would love to do that. I imagine it to be quite a pain in the ass having to move everything we own in order to get that done though. Plus the cost will be rather high I assume and I dont like parting with my cashola even though I have enough to do it.
gosh and my dining room and bedroom need curtains