alien amp pharm said:My cousin is an excellent framer. He does this stuff for a living.
Our cut man (saw guy) quit on us a few weeks into the project and so I tried taking his spot. Now I'm fairly good at carpentry and construction but I had no idea of the lingo he was shouting at me.
"I need a 2X6er three-quarter set ahead at 14 inches with a birdmouth midspan and a dog ear cut at a 30 bevel for a 8 and 12 common"
I was like WTF? Did he really just say he needed a dog ear?
It took me a while to catch on.
damn. i wouldn't know what that is, except a 30 bevel for an 8 and 12 probably means this was for a ceiling joist?