Age: 22
Height: 5ft 10
Weight: 222lbs
Cycle History: First one (Test E only 500 mgs week)
Training for 5 yrs
Hey guys I just need help to plan my future cycles I know I have ages
but I like to be organised so I can get everything I need from
AI's, PCT, HCGenerate, SARMS, Prolactin, Caber etc.
I live in AUSTRALIA, therefore SUMMER starts in DECEMBER.
As of Next week I am starting my PCT from a 10 week Test E cycle,
PCT consits of Chlomid 25/12.5/12.5/12.5, HCGenerate, Forma, Unleashed/Post cycle
After PCT im CUTTING with Sarms stack of OSTA(50mg a day)+ S4 (25mg AM and PM) + MINI PCT.
I was wondering to see what would be better to be shredded for next summer, as well as this SUMMER.
--> CYCLES being TIME ON = TIME OFF
--> PCT Dialed in and Prolactin/AI/HCG through cycle/Cycle Support if needed
--> SARMS (OSTA + S4 + MINI PCT) between cycles
Within a 1 year period:
OPTION A:
CUT with PROP/ANAVAR
(LEAN BULK with SARMS)
LEAN BULK 10 weeks = 1# Prop/NPP/DBOL
(Will have 4 months before summer, therefor CUT with SARMS)
CUT DURING SUMMER WITH AAS
OR
OPTION B
2 CYCLES OF SARMS TO CUT (FOR THIS SUMMER STARTING DECEMBER)
2 X LEAN BULK THROUGH THE YEAR
1# Prop/NPP/DBOL
- SARMS CUT BETWEEN
2# Prop/Tren A
This will allow me to have 2 Months before Summer to CUT.
^^ Will this be enough time to cut?
Thank you.
Height: 5ft 10
Weight: 222lbs
Cycle History: First one (Test E only 500 mgs week)
Training for 5 yrs
Hey guys I just need help to plan my future cycles I know I have ages
but I like to be organised so I can get everything I need from
AI's, PCT, HCGenerate, SARMS, Prolactin, Caber etc.
I live in AUSTRALIA, therefore SUMMER starts in DECEMBER.
As of Next week I am starting my PCT from a 10 week Test E cycle,
PCT consits of Chlomid 25/12.5/12.5/12.5, HCGenerate, Forma, Unleashed/Post cycle
After PCT im CUTTING with Sarms stack of OSTA(50mg a day)+ S4 (25mg AM and PM) + MINI PCT.
I was wondering to see what would be better to be shredded for next summer, as well as this SUMMER.
--> CYCLES being TIME ON = TIME OFF
--> PCT Dialed in and Prolactin/AI/HCG through cycle/Cycle Support if needed
--> SARMS (OSTA + S4 + MINI PCT) between cycles
Within a 1 year period:
OPTION A:
CUT with PROP/ANAVAR
(LEAN BULK with SARMS)
LEAN BULK 10 weeks = 1# Prop/NPP/DBOL
(Will have 4 months before summer, therefor CUT with SARMS)
CUT DURING SUMMER WITH AAS
OR
OPTION B
2 CYCLES OF SARMS TO CUT (FOR THIS SUMMER STARTING DECEMBER)
2 X LEAN BULK THROUGH THE YEAR
1# Prop/NPP/DBOL
- SARMS CUT BETWEEN
2# Prop/Tren A
This will allow me to have 2 Months before Summer to CUT.
^^ Will this be enough time to cut?
Thank you.
Last edited:

Please Scroll Down to See Forums Below 










